The Market

Where Compute Prices Are Set

One listed compute product has a date, and compute derivatives already trade bilaterally with an implied forward curve published by prediction markets.  The listed venues arrive into an existing over-the-counter market.
Structure

Who Is Building What, And Where Each Venue Stands

SponsorProductVenueTimingStatus
CME / Silicon DataCompute futures, H100 and B200 rental indexNYMEXFirst trade 05 Oct 2026Listing, subject to review
ICE / OrnnCompute futures on the OCPI indexICE Futures USAnnounced, no listing dateAnnounced
Architect / American Innovation ExchangeGPU and DRAM perpetual futures and optionsOwn designated contract marketGoing live, pending reviewVenue acquired
OTC bilateralCompute forward swaps, GPU residual value swapsDealer to dealerTrading nowLive
Prediction marketsEvent contracts on index levels, with an implied forward curve publishedKalshi and othersTrading nowLive
CFTCRequest for comment on compute derivativesn/aComment period openOpen consultation
NYMEX / ICENatural gas and power futuresNYMEX, ICELive, deep liquidityLive
Reading The Table

Cross-venue basis is sized at zero until both legs are live and cleared, and natural gas carries the process while compute liquidity forms.

Demand

Why Compute Needs A Forward Curve

What The Contract Transfers

A hedger using this contract fixes the market-clearing rental rate for a standardized GPU-hour.  That rate is driven, in order of weight, by implied depreciation on the installed GPU base, fleet utilization and operator margin, new capacity coming online, data center capital cost, and power price.

Cost Stack

What Is Inside A GPU-Hour At The $2.64 H100 Index

46%Implied operator margin
35%Hardware amortization
2.2%Electricity, at $45 per MWh
16.8%Facility, network, staff and overhead
What The Index Prices

The contract is a levered instrument on implied GPU depreciation and fleet utilization, both observable, contested and slow to reprice.  Quadrupling power to $200 per MWh moves the GPU-hour cost stack by under ten percent, which is why power earns its place as a regime indicator rather than a hedge relationship: it signals whether capacity will be built and energized, a supply-formation signal with a long lead.

Assumptions0.70 kW thermal design power, 1.45x node overhead, 1.25 power usage effectiveness, a $27,500 GPU over a four-year life, 85 percent utilization and $11,000 per kW of data center capital cost over twelve years.  Illustrative and model-derived.
Entrants

The Compute Value Chain, Ordered By How Soon Each Participant Reaches The Listed Market

ParticipantWhat They ControlWhy They EnterEntryWhat They Bring
Neoclouds and GPU lessorsThe rentable fleet and spot rateUnhedged rental revenue against dated debtFirstThe natural short, the cleanest commercial hedge
GPU-backed lendersAdvance rates and covenantsResidual value and post-contract revenue riskEarly, with borrowersThe forcing function: covenant-driven flow
Developers and IPPsMegawatts and energization timingThe toll-versus-merchant choice gets a priceEarly, small sizePhysical-layer data and offtake structuring demand
Accelerator vendorsAllocation and residual guarantiesExposure held through backstops and guarantiesVia financingDeep exposure, one step removed
Banks and merchant dealersBalance sheet to warehouse riskStructuring fees on hedges laid off in listed marketsWith the lendersThe first listed volume
Hyperscalers and AI labsIn-house versus rented capacityBudget certainty on their largest cost lineLater, via treasurySize that releases the capacity constraint
Multi-strategy fundsNothing physicalReturn, once open interest absorbs an allocationLast, at scaleLiquidity, and the close of the launch window
Sequence Is The Insight

In crude, physical participants and their lenders reached the paper market years before financial players, and the same order is forming here.  One seat has no occupant: the independent intermediary between producers and consumers with no fleet of its own.  That seat is this business.

Hedger Flow

Who Sells Which Part Of The Curve

Map the hedgers onto the curve and a shape falls out of it.  Pick a participant and see the exposure they hold and the tenor bucket their natural hedge lands in.
Curve Effect

Hedging demand is a bid at the front and an offer from the belly through the deferred.  The deferred should trade at a persistent discount to the value the physical economics support: a hedging-pressure premium earned by the party that warehouses it.

Trajectory

Where This Market Goes, And The One Indicator That Matters

NOW TO 2027

Compute Enters Project Finance

$500bn+ financing platforms and a $105bn residual guaranty put compute on infrastructure balance sheets.  The first OTC compute forward swap has traded, prediction markets publish an implied H100 forward curve, and three listed venues are in flight.

2027 TO 2028

The Strip Becomes The Lay-Off Venue

Options on the compute future and basis swaps against ERCOT and PJM power.  Banks write five-year compute collars and lay them off into the listed strip.  Position limits and large-trader reporting arrive with real open interest, and non-incumbent chip contracts list.

2028 ONWARD

Compute Trades Like Energy

Offtake contracts quote as an index calendar strip plus a differential, the way LNG quotes off Henry Hub.  Energy-normalized contracts make the power-to-compute spread listable, and residual value risk moves from bilateral guaranties onto cleared markets.

The Monitoring Signal

Listed volume in this complex follows over-the-counter dealer activity ahead of end-user hedging.  Announced OTC swaps, structured collars and residual value transfers are the leading indicator of when the order book can carry outside capital.  Exchange press releases are a lagging one.

SourcesBuilt from public disclosures, exchange and index provider announcements, regulatory filings and licensed market data as of September 2026.  Company, exchange and index names appear for illustration only and no affiliation with or endorsement by any of them is implied.

The Curve Opens In October

We are instrumenting the listing from the first session.  If you hold compute exposure and want it priced, marked or hedged, start here.